We met yesterday at the laneway to meet with Angelito before we all dispersed for our summer vacation.
We had signed off our kitchen cabinet drawings earlier that day, and hope that the kitchen all comes together in time for its installation in early October.
We also spoke with someone about the AV, TV, telephone connections, and the built-in vacuum. Plus someone about our security (turns out our doors and windows already make the place into a live-in vault).
Angelito assured us that the radiant heat in the floors will not shrink our hardwood flooring because 1) it’s engineered wood, not solid hardwood, and 2) it’s made for radiant heat. We spoke about where the electrical boxes will go for our bedside reading lights.
And I grabbed a couple of pictures. Here you can see the bedroom wall with the radiant heat lines
The electrician has been busy and will continue to put in the switches and boxes we need.
Soon we will have the rolled steel roof installed — it’s ready for us! We are looking forward to seeing that!